Digital X Solution runs, hosts, and leases the hardware behind the chain — ASIC and GPU fleets, climate-controlled facilities, and the operational discipline to keep them running at 99.98% uptime.
The same four stages whether you're leasing a handful of units or commissioning a facility.
We size the deployment against your power, space, and budget — and tell you honestly if the numbers don't work.
Hardware is racked, tuned, and networked at one of our facilities or yours, then brought online in stages.
Every unit reports hashrate, temperature, and power draw continuously, watched by our operations team.
Add capacity in the same modular blocks, without re-architecting power, cooling, or monitoring.
Four things we hold ourselves to on every deployment, whether it's a single rack or a full facility buildout.
Facilities weighted toward renewable and stranded power, with efficiency tuning at the rack level, not just the site level.
Capacity added in modular blocks, so a 50-unit deployment and a 5,000-unit deployment follow the same playbook.
Physical access control, network segmentation, and custody practices built around the assumption that hardware gets targeted.
A team that has run fleets through halvings, power curtailments, and firmware failures — and kept them online.
Whether you're mining directly, leasing capacity, or need a facility built from the ground up.
We run ASIC and GPU fleets on our own infrastructure, mining top-tier coins and optimizing for hash-per-watt, not just hash rate.
Access high-performance mining hardware without the upfront capital outlay or procurement lead time.
Strategy for firms and individuals entering mining — hardware selection, siting, power contracts, and ROI modeling.
Secure, climate-controlled hosting built for 24/7 mining loads, with power and cooling sized to the fleet, not the other way around.
The specs that actually determine whether a fleet stays profitable.
We integrate renewable sources and energy-saving techniques wherever the site allows, and we report on it rather than assume it's assumed.
A sample of what's currently deployed across our facilities — available for lease or dedicated hosting.
Air-cooled ASIC tuned for sustained load in high-density racks.
GPU rig built for altcoin flexibility and firmware-level tuning.
Immersion-cooled variant for sites without forced air budget.
No. Most clients start on our leasing program, which gets you hashing power without the upfront capital cost or procurement lead time of buying rigs outright.
Across sites selected for renewable or stranded power access. We'll confirm exact siting and power mix for your deployment during the consult stage.
Every unit reports hashrate, temperature, and power draw continuously. Our operations team is alerted the moment any metric drifts outside range, day or night.
Yes — our data center solutions cover third-party hardware hosting with the same monitoring and cooling standards we apply to our own fleet.